Blog
Get the latest from JMT Consultants.
Digitizing Paper-Doll Plans for Concrete Tilt-Up Construction
Back to blog Concrete TiltUp panels are poured on-site, typically on the floor slab towards the interior of the building. The construction team needs to know exactly where they will place formwork and layout the panels to be poured on the slab before safely and efficiently lifting the panels into final position. A nice caption…